[113 projects started in Suqian, Jiangsu]On September 29th, 113 major projects of the 2021 China Suqian Green Industry Fair in Suqian City, Jiangsu Province started intensively, with a total investment of 114.36 billion yuan and an annual planned investment of 23.92 billion yuan. Editor/He Yuting
On September 8, 2026, the Cundinamarca Province of Colombia held an international promotion event for the northern tram project, with representatives from 17 countries including China, South Korea, the United States, and Portugal in attendance. The Chinese side expresses its willingness to participate. The project is 48.9 kilometers long with a total investment of over 5.5 billion US dollars, and the bidding work is progressing in an orderly manner. Editor/Min Jing
On September 9, 2026, the CCCC Malaysia East Coast Connection Railway Project launched dynamic testing operations simultaneously for the east and west sections, with the west section starting speed increase tests and the east section advancing signal system tests. The project takes Guandan as the dividing point, and the testing has moved from single section testing to full line multi system verification, achieving phased progress in engineering construction. Editor/Min Jing