[Zoomlion ZCC16000 batch signing ceremony was successfully held]On the morning of May 6, 2022, representatives of Xinjiang Sunshine Fire Power Engineering Co., Ltd. and Zoomlion Engineering Crane Company gathered in Changsha, and the ZCC16000 batch signing ceremony was grandly held. Zoomlion Engineering Crane Marketing Department signed a procurement contract with Xinjiang Sunshine Fire Power Engineering Co., Ltd. Editor/Ma Xue
On June 23, 2026, a press conference was held in Lhasa on the high-quality development achievements of Linzhi City, Xizang during the 14th Five Year Plan period and the planning work during the 15th Five Year Plan period. At the meeting, it was introduced that the total installed capacity of clean energy in the city has increased from 356800 kilowatts to 450800 kilowatts by 2025, and the installed capacity of hydropower under construction has reached 4.9292 million kilowatts, achieving zero breakthrough in the large-scale development and application of new energy.Editor/Gong Ziwei
Recently, key progress has been made in the construction of the Hainan Guangdong Power Flexible Mutual Aid Project, and the survey of submarine cable routes has been fully completed. After the completion of the project, the transmission channel between Hainan Power Grid and Southern Power Grid's main grid will increase from the current dual channel to three channel, with a total transmission capacity of 1.8 million kilowatts, and the power mutual assistance capacity between the two provinces will be greatly improved by 50%.Editor/Gong Ziwei