[Zoomlion ZCC16000 batch signing ceremony was successfully held] On the morning of May 6, 2022, representatives of Xinjiang Sunshine Fire Power Engineering Co., Ltd. and Zoomlion Engineering Crane Company gathered in Changsha, and the ZCC16000 batch signing ceremony was grandly held. Zoomlion Engineering Crane Marketing Department signed a procurement contract with Xinjiang Sunshine Fire Power Engineering Co., Ltd. Editor/Ma Xue
Click to see more live >>
Latest
  • 2026.03.20 09:06
  • [The 100 billion yuan infrastructure project in Sangdao has been launched]
  • Zanzibar, Tanzania has launched two major projects, the International Convention and Exhibition Center and the "City of the African Cup", with a total investment of over 700 billion shillings. The selection of the exhibition center in the Fumba area aims to create a regional trade hub; The "City of the African Cup" is accelerating its construction in preparation for the 2027 African Cup and supporting the dual wheel drive of sports and tourism.Editor/Gao Xue
  • 2026.03.20 09:04
  • [Approval extension for Yangjiang offshore wind power project]
  • The approval of the Three Seas Wind Power Project on Sanshan Island in Yangjiang has been postponed until May 2027. The total investment of the project is 5.444 billion yuan, with an installed capacity of 500MW. It is located in the southern sea area of Hailing Island and is currently in the pre construction preparation stage.Editor/Gao Xue
Share

Retrieve password

Get verification code
Sure