[Cummins' 2000th QSK95 rolls off the assembly line]The QSK95 has a bore of 190 mm and a stroke of 210 mm. The modular high-pressure common rail fuel system makes the engine have lower noise and less vibration. The advanced design provides more convenience for the maintenance and maintenance of the engine, and the use of new materials makes the engine more durable.Editor/XuNing
On November 19, 2026, with the grid connection of some units of the wind farm in Mile Gorge, Yunnan, the installed capacity of new energy in Yunnan reached 83.599 million kilowatts (64.751 million kilowatts for photovoltaics and 18.848 million kilowatts for wind power), surpassing the installed capacity of hydropower by 83.41 million kilowatts for the first time and becoming the largest power source in the province. This marks the official transition of Yunnan's power structure from being dominated by hydropower to a new stage of water new synergy and multi energy complementarity.Editor/Gong Ziwei
At 20:50 on November 20, 2026, the second unit of the Huadian Kashgar 2 × 660000 kW cogeneration project successfully passed the 168 hour full load trial operation, marking the full capacity commissioning of Xinjiang's largest cogeneration project and China Huadian's first "coal-fired+new energy joint venture" project.Editor/Gong Ziwei