[CREG TBM Shutong rolls off the production line in Sichuan]On May 8, 2022, the off-line ceremony of the first large-diameter TBM "Shutong", the first large-diameter TBM in China built by China Railway Engineering Equipment, was held in Deyang, Sichuan. The equipment will serve the mountain rail transit project from Dujiangyan to Siguniang Mountain. Bauhinia tunnel construction. Editor/Ma Xue
Kenya, in collaboration with the World Bank, has completed the completion of the Ketale Lodwar National Highway with an investment of approximately $775 million, providing direct access to the South Sudan border. The travel time has been significantly reduced, and transportation costs have significantly decreased. The project also provides electricity and solar street lights for over a thousand households along the route, enabling some towns to achieve all-weather power supply and improving local transportation and living conditions.Editor/Gong Ziwei
The Thai Ministry of Transport has announced that the Bangkok Pangsilo high-speed railway, a joint venture between Japan and Thailand, is scheduled for annual review in 2027, with construction starting in 2030 and operation in 2036. It will be the first phase of the Bangkok Chiang Mai high-speed railway. Thailand's high-speed rail selects partners in different directions, with the northern line connecting to Japan and the northeast Bangkok Langkai project being a Sino Thai cooperation project that can cross-border connect Laos and China. The first phase of the China Thailand high-speed railway is under construction, and negotiations are underway for the second phase. The northern route focuses on local passenger transportation in northern Thailand and has no cross-border function. The implementation cycle of multiple high-speed rail plans in Thailand is long, and the projects still face practical challenges.Editor/Gong Ziwei