[Sany Heavy Energy and China Power signed a strategic cooperation agreement]On May 6, 2022, Gao Ping, President of China Power, and his party visited Sany Heavy Energy, and the two parties signed a strategic cooperation agreement. According to the agreement, the two parties will focus on investment in the wind power energy industry and energy technology innovation as key areas of cooperation. Editor/Ma Xue
On June 30, 2026, the excavation of the underground powerhouse of the Nanshankou Pumped Storage Power Station in Golmud, Qinghai, undertaken by Three Gorges Construction, was completed. The power station is the world's largest under construction pumped storage project at an altitude of over 3500 meters, with a total installed capacity of 2.4 million kilowatts. The project has entered the pouring and equipment installation stage, and the first batch of units is planned to be put into operation in 2028. Editor/Min Jing
On June 27, 2026, ENERGY CHINA Gezhouba Group began construction of the country's first integrated zero carbon highway project in Guangxi. Supporting photovoltaic energy storage and heavy-duty truck replenishment network, relying on ecological carbon sinks to achieve net zero carbon operation, in line with the national zero carbon channel construction deployment, and creating a demonstration model for low-carbon transformation of transportation. Editor/Min Jing