[CRCC Binchang Endeavour Mine TBM Offline in Changsha]On the morning of May 9, 2022, the "Binchang Endeavour" mining TBM developed by CRCC for Shaanxi Shaanxi Coal Binchang Mining Co., Ltd. rolled off the assembly line in the CRCC Changsha First Industrial Park, which will help the mining industry increase efficiency and production. Editor/Ma Xue
On October 29, 2026, the signal system of the Khorgos Silk Road Special Line Junction Station contracted by First Engineering Co., Ltd. will be put into operation at one time, realizing zero fault tolerance. The line will be paved for 7 kilometers, with a design capacity of 6 million tons, and is ready for operation. Editor/Min Jing
On November 1, 2026, China's emergency aid project for post disaster bridge reconstruction in Sri Lanka began construction on the first bridge in the western city of Gampoha. Ambassador Wei Huaxiang and two Sri Lankan ministers attended the event, signed a project proposal exchange letter, and donated stationery and supplies to local elementary school students. Editor/Min Jing