[Guizhou realizes connection between China-Laos railway and China-Europe train] On the morning of May 18, 2022, the five overseas containers that arrived in Guiyang Comprehensive Bonded Zone via the China-Laos Railway took the China-Europe freight train and departed from Guiyang Doulaying International Land-Sea Link Logistics Port, and are expected to arrive in Budapest, Hungary in half a month. This is the first time in the country that the China-Laos railway and the China-Europe freight train have been connected for international cargo testing. Editor/Ma Xue
Click to see more live >>
Latest
  • 2026.11.28 11:08
  • [Asia Pacific Digital Intelligence Platform unveiled in Chengdu]
  • On November 28, 2026, the Asia Pacific Digital Intelligence Empowerment Innovation and Development Cooperation Platform was unveiled and launched in Chengdu, Sichuan. This platform is one of the 75 achievements of China's hosting of the Asia Pacific Economic Cooperation in 2026. The platform focuses on data infrastructure, data development and utilization, industrial digitization transformation, and digital cultural and creative industries, promoting the exchange of experiences, resource docking, and cooperation among all parties, filling the gaps in regional digital development, narrowing the digital divide in the Asia Pacific region, and opening up new space for innovative development of economies under the APEC framework.Editor/Li Xiaohua
  • 2026.11.28 11:03
  • [The Qili Village Tunnel Breaks Through the Kilometer Mark]
  • Recently, China Railway First Group YF High speed Railway Section 3 Qilicun Tunnel entrance main tunnel excavation exceeded 1000 meters, completing more than 60% of the construction tasks in the work area. The project relies on labor competitions to refine the construction plan, and technical personnel are rooted in the hands to streamline each process. On site implementation of the three spraying, two scraping, and one sweeping process, optimization of blasting and grouting construction, strict control of over excavation and under excavation, and high initial support quality in the entire line evaluation, becoming a standardized benchmark. Since the start of construction, we have maintained zero safety accidents, stable and controllable surface subsidence and rural road traffic. In the future, we will solidify construction standards and make every effort to promote the goal of tunnel penetration.Editor/Li Xiaohua
Share

Retrieve password

Get verification code
Sure