[Guizhou realizes connection between China-Laos railway and China-Europe train]On the morning of May 18, 2022, the five overseas containers that arrived in Guiyang Comprehensive Bonded Zone via the China-Laos Railway took the China-Europe freight train and departed from Guiyang Doulaying International Land-Sea Link Logistics Port, and are expected to arrive in Budapest, Hungary in half a month. This is the first time in the country that the China-Laos railway and the China-Europe freight train have been connected for international cargo testing. Editor/Ma Xue
On November 19, 2026, with the grid connection of some units of the wind farm in Mile Gorge, Yunnan, the installed capacity of new energy in Yunnan reached 83.599 million kilowatts (64.751 million kilowatts for photovoltaics and 18.848 million kilowatts for wind power), surpassing the installed capacity of hydropower by 83.41 million kilowatts for the first time and becoming the largest power source in the province. This marks the official transition of Yunnan's power structure from being dominated by hydropower to a new stage of water new synergy and multi energy complementarity.Editor/Gong Ziwei
At 20:50 on November 20, 2026, the second unit of the Huadian Kashgar 2 × 660000 kW cogeneration project successfully passed the 168 hour full load trial operation, marking the full capacity commissioning of Xinjiang's largest cogeneration project and China Huadian's first "coal-fired+new energy joint venture" project.Editor/Gong Ziwei