[Chongqing Liangjiang New Area signed 7 key projects]On May 18, 2022, Chongqing Liangjiang New District signed a contract to introduce 7 energy storage-related projects with a total investment of 10.9 billion yuan. The signed projects include 7 energy storage related projects including Chongqing Energy Investment Clean Energy Headquarters Project, State Grid Smart Energy Industry Project, and Ganfeng New Battery Industrial Park New Investment Project, covering R&D innovation, headquarters operation, manufacturing, testing and certification and many other formats. Editor/Ma Xue
Recently, the widening renovation of the Nanzhong Bridge in the connecting section of the Lion Ocean Passage has started, and the bridge has entered closed construction. As the world's first large-span concrete cable-stayed bridge widening project with a central cable surface, the project has overcome technical bottlenecks such as the coordination of new and old structures through thousands of breakthroughs. We will overcome the challenges of millimeter level positioning of steel structures and on-site pouring of new lightweight concrete during construction, and implement environmental protection measures such as milling and dust reduction, and harmless treatment of solid waste and sewage. The project duration is about 300 days. Editor/Cheng Liting
On March 25, 2026, Huaneng International released its 2025 annual report, which showed that the investment in new energy in 2026 was 37.7 billion yuan, of which wind power was 30.5 billion yuan, accounting for 80.9%, a year-on-year increase of 27.3%. Solar energy investment has dropped to 7.2 billion yuan. The company focuses on the layout of deep-sea offshore wind power and large-scale wind and solar power bases, with an installed capacity of 5880 megawatts of offshore wind power.Editor/Gao Xue