[AlDhafra discovers new fields at BuHasa, OnshoreBlock3 and AlDhafra]Abu Dhabi National Oil Company made new oil discoveries in the emirate's largest onshore oil field, BuHasa, and in the onshore Block3 and AlDhafra oil concessions. BuHasa has a crude oil production capacity of 650,000 barrels per day and is operated by Adnoc Onshore as part of the Adnoc Onshore Concession. Editor/Xing Wentao
On May 31, 2026, the excavation of the first foundation of the Dalat Mengxi 1000 kV AC power transmission and transformation project marked the substantial construction stage of the supporting project for the external transmission channel of the national Shagehuang large base. The project investment is 4.374 billion yuan, and a new double circuit line of 124.4 kilometers will be built, which is a key supporting facility for the ± 800 kV high-voltage direct current project from Mengxi to Beijing Tianjin Hebei. After completion, it will solve the problem of new energy consumption in the Kubuqi Desert and the central and northern parts of Ordos, providing solid support for the extension of the North China ultra-high voltage network to western Mongolia and ensuring clean power transmission to the Beijing Tianjin Hebei region.Editor/Cheng Liting
On June 1, 2026, the plan for the expansion project of Haikou East Station was publicly announced, with a total investment of 186 million yuan and an expansion area of 5970 square meters. The project will carry out a systematic renovation of the first and second floors of the station, adding barrier free facilities, expanding the waiting hall, optimizing the entry and exit flow lines, and simultaneously improving supporting facilities such as power supply and distribution, fire protection, etc. The construction adopts the "reverse edge construction" scheme to ensure uninterrupted operation.Editor/Cheng Liting