[AlDhafra discovers new fields at BuHasa, OnshoreBlock3 and AlDhafra]Abu Dhabi National Oil Company made new oil discoveries in the emirate's largest onshore oil field, BuHasa, and in the onshore Block3 and AlDhafra oil concessions. BuHasa has a crude oil production capacity of 650,000 barrels per day and is operated by Adnoc Onshore as part of the Adnoc Onshore Concession. Editor/Xing Wentao
On November 10, 2026 local time, the road design and construction project for the Sacklepi to Tapita section of the southeastern corridor in Liberia, undertaken by China Railway Seventh Bureau Overseas Company, was issued a preliminary acceptance certificate by the infrastructure implementation unit of the owner's Public Works Department. The main project has been substantially completed and entered the defect liability period. The project is 61.33 kilometers long and adopts a design build transfer model.Editor/Cheng Liting
On November 10, 2026, the Jiaxing Transportation Construction Engineering Industry Workers' Living Environment Improvement Conference was held in Tongxiang. Attendees observed the G60 Shanghai Kunming Expressway Tongxiang Gaoqiao section reconstruction project on site. At present, the project has completed an investment of 2 billion yuan, which is 88.5% of the annual plan, and the lower structure of the bridge has been fully deployed. This 13.7-kilometer high-speed reconstruction line will release passage space for Shanghai Hangzhou high-speed railway related projects. After completion, it can release nearly 6400 acres of development land to support the construction of Tongxiang High speed Railway Industry New City. Editor/Cheng Liting