[China's large-diameter and multi-support TBM Plateau Pearl off the line at CRCC]Recently, the domestic large-diameter multi-support TBM Plateau Pearl, jointly built by CRCC and the 14th Bureau of China Water Resources, rolled off the production line in the Changsha Second Industrial Park of China Railway Construction Heavy Industry. The equipment will be used for construction under extreme conditions such as high altitude, high ground stress, and super hard rock. The excavation diameter of TBM is 10.23 meters, the length of the whole machine is about 185 meters, the total weight is about 2300 tons, and the installed power is 8200 kilowatts. Editor/Ma Xue
The Qinghai Provincial Development and Reform Commission has released the first batch of bidding for independent new energy storage projects on the grid side in 2026, with a total scale of 2GW and an energy storage duration of no less than 4 hours, to be implemented in 5 sections. The project is planned to be connected to the grid by the end of September 2027, and can enjoy an annual compensation of 185 yuan per kilowatt capacity to assist in the construction of new power systems in the province. Editor/Min Jing
The Vietnamese parliament has passed a resolution to increase the scale and configuration standards of the cross-border railway construction in Laojie, Hanoi, and Haiphong, and significantly increase investment. The railway is expected to be completed by 2030, optimizing cross-border trade logistics between China and Vietnam, connecting the China Europe transportation corridor, improving the layout of the Pan Asian Railway, and helping Vietnam enhance its position as a regional transportation hub. Editor/Min Jing