[China's large-diameter and multi-support TBM Plateau Pearl off the line at CRCC]Recently, the domestic large-diameter multi-support TBM Plateau Pearl, jointly built by CRCC and the 14th Bureau of China Water Resources, rolled off the production line in the Changsha Second Industrial Park of China Railway Construction Heavy Industry. The equipment will be used for construction under extreme conditions such as high altitude, high ground stress, and super hard rock. The excavation diameter of TBM is 10.23 meters, the length of the whole machine is about 185 meters, the total weight is about 2300 tons, and the installed power is 8200 kilowatts. Editor/Ma Xue
On August 5th, it was reported that the Maldang Hydropower Station of National Energy Group Qinghai Company had a monthly power generation of 1.124 billion kilowatt hours in July 2026, setting a new historical high since its commissioning.Editor/Cheng Liting
As of the end of June 2026, the installed capacity of wind and solar new energy power generation in Shanxi Province has exceeded 80 million kilowatts, reaching 80.6121 million kilowatts. During the 14th Five Year Plan period, the province added 45.0091 million kilowatts of wind and solar new energy power generation installed capacity, an increase of 137.11% compared to the end of the 13th Five Year Plan.Editor/Cheng Liting