[The Jimei-Tongan section of Xiamen Metro Line 6 starts construction]On June 15, the Jimei-Tong'an section of Xiamen Rail Transit Line 6 officially started construction. The project has a total length of 30.7 kilometers, from Jiageng Stadium to Tongxiang High-tech City (Jiatong Section) and Huaqiao University to Binhai West Avenue (Huabin). Section) consists of two parts, with a total of 17 stations and a maximum operating speed of 100 km/h. Editor/He Yuting
The Chengjiang Tunnel in Yuxi section of the Yunnan Central Water Diversion Phase II supporting project, undertaken by China Railway First Group, has been successfully completed. The geological conditions of the tunnel are complex and the construction risk is high. After completion, it can provide water supply to the Chengjiang area every year, help protect the ecological environment of Fuxian Lake, and build a strong regional water safety barrier. Editor/Min Jing
At the bank of the Taihu Lake Lake in Wuxi, the Xiyi S2 Line, which CR14G participated in, was formally driven through the the Taihu Lake Lake Tunnel. The starting shield Pioneer was equipped with an intelligent model, which posed a serious construction challenge. After the completion of the project, it will contribute to the integration of the Yangtze River Delta and promote the coordinated development of Xiyi. Editor/Min Jing