[China's PV module exports reached 14.4GW in May]According to PV InfoLink's analysis of China's customs export data, China's PV module exports in May reached 14.4GW, a year-on-year increase of 95%; the cumulative module exports from January to May reached 63.4GW, a year-on-year increase of 102%, and demand grew Pretty strong. Editor / Xu Shengpeng
The fourth phase of Huaneng Yuhuan Power Plant has completed the delivery of the world's first 650 ℃ coal-fired demonstration unit HT700R steam turbine rotor in Shanghai. The rotor adopts domestically produced high-temperature alloy and collaborates with multiple units to tackle the challenges of the entire chain, marking the emergence of new materials from the laboratory and laying a solid foundation for the timely production of core components for this national major scientific and technological research project. Editor/Min Jing
The main structure of the signal complex building for the railway from Yining City to Aksu City in Ili Prefecture, constructed by CR21G, has been topped out, making it the first topped out signal building on the entire line. The project is located near the operating line, with strict construction control measures. After the completion of the railway from Yining City to Aksu City in Ili Prefecture, it will fill the gap in the Tianshan Railway, weave a large railway network in Xinjiang, and reduce logistics costs between the north and south of Xinjiang. Editor/Min Jing