[Shanghai develops the entire hydrogen energy industry chain]The Shanghai Municipal Development and Reform Commission issued the "Medium and Long-Term Plan for the Development of the Hydrogen Energy Industry in Shanghai (2022-2035)". The "Plan" proposes to build a leading enterprise in the field of hydrogen energy and a world-class technology innovation center. By 2025, the scale of the hydrogen energy industry chain will be expanded. exceeded 100 billion yuan. Editor / Xu Shengpeng
On October 11, 2026, the Gaosheng No.2 Tunnel of the West Chongqing High speed Railway, constructed by CRSG, was successfully completed in Kaizhou District, Chongqing. The tunnel has a total length of 7234 meters and is classified as a Class I high-risk tunnel, overcoming multiple geological challenges. The project has laid the foundation for the timely opening of the West Chongqing high-speed railway, improved the high-speed railway network in the central and western regions, and driven regional coordinated development. Editor/Min Jing
On October 10, 2026, the Yanwei 1000 kV High Voltage Project was completed and put into operation, which is also the first ultra-high voltage AC transmission and transformation project put into operation during China's 15th Five Year Plan period. The total length of the project line is 1197 kilometers. After it is put into operation, nuclear power from Haiyang, Laiyang and other places in Yantai, Shandong will be sent out through this channel, greatly improving the green power supply capacity in Shandong Province. Editor/Min Jing