[Shanghai develops the entire hydrogen energy industry chain]The Shanghai Municipal Development and Reform Commission issued the "Medium and Long-Term Plan for the Development of the Hydrogen Energy Industry in Shanghai (2022-2035)". The "Plan" proposes to build a leading enterprise in the field of hydrogen energy and a world-class technology innovation center. By 2025, the scale of the hydrogen energy industry chain will be expanded. exceeded 100 billion yuan. Editor / Xu Shengpeng
On March 24, 2026, multiple evaluation services for the Zhanjiang Haikou Cross Sea Ferry Project (Guangdong section) were announced, and the preliminary design elements will be fully prepared. The feasibility study of the project has been approved, with a total investment of 39.97 billion yuan and a construction period of 4 years. The route includes a ferry section of 132.3 kilometers on land and 22.5 kilometers at sea, using a plan of crossing the sea by boat. Editor/Cheng Liting
On March 25, 2026, the Mudanjiang Dunhua Railway (Heilongjiang section) issued a bidding announcement for the preparation of environmental impact assessment reports. The feasibility study of the project is awaiting approval and is about to enter the approval stage. Jilin Province has explicitly listed it as a key project to be started in 2026. The total length of the line is about 195.6 kilometers, with a designed speed of 250 kilometers per hour and a total construction period of 4.5 years.Editor/Cheng Liting