[Won the bid for the Yichang section of the Xiangyang-Yichang Expressway in Hubei]On June 30, 2022, the Hubei Electronic Bidding and Bidding Trading Platform released the announcement of the results of the selection and evaluation of investors' bidding and cooperation units for the Yichang section of the Xiangyang-Yichang Expressway. The project is divided into 6 bidding sections, and the 4th bidding section is not included in this time. selection. The project was won by 5 units including China Railway 18th Bureau Group Co., Ltd. and CCCC Fourth Navigation Engineering Bureau Co., Ltd., and the estimated total amount of the project is about 16.7 billion yuan. Editor / Zhao E
On April 16, 2026, the Wenyu section of the Hangzhou Taizhou high-speed railway officially started static acceptance, and the main project was basically completed. The main line of this section is 37 kilometers long, with a designed speed of 350 kilometers per hour and a bridge tunnel ratio of 90.34%. The Lijiashan Tunnel is a controlled project for the entire line. After acceptance, it will be transferred to joint debugging and testing, and is expected to be opened within the year. At that time, it will end the history of Yuhuan not being connected to railways and help Zhejiang build a 1-hour high-speed railway transportation circle. Editor/Cheng Liting
The rotor of Unit 3 of the Dashixia Water Conservancy Hub in Xinjiang has been successfully lifted, and the project has entered the final assembly and commissioning stage. The project has the world's tallest 247 meter concrete faced gravel dam with a total installed capacity of 750000 kilowatts. It is planned to be fully put into operation in the second half of 2026, benefiting 650000 households and 6.8 million acres of downstream irrigation areas. Editor/Cheng Liting