[Netherlands to build 10 GW national green hydrogen network]Dutch state-owned gas infrastructure specialist Gasunie has announced plans to create a national network system linking the supply and demand of carbon-free hydrogen. The network will have an initial capacity of 10 gigawatts, and its construction will require an investment of around 1.5 billion euros. Editor/Xing Wentao
On the afternoon of May 23, 2026, a container train loaded with 170 tons of calcium hydroxide sounded its horn and departed from Guigang Station, passing through Nanning International Railway Port for transfer and transportation to Vietnam's Anyuan Station. This is a new Sino Vietnamese cross-border logistics route added after the opening of the Liuzhou Nanning Vietnam railway cross-border logistics channel, adding a stable and efficient cross-border logistics channel for economic and trade exchanges between Guangxi and Vietnam. Editor/Cheng Liting
The South Zhuhai (Central) intercity railway will start construction in March 2023, divided into three sections: Guangzhou, Zhongshan, and Zhuhai. At present, 91% of the civil engineering in the Guangzhou section has been completed, and 3 stations have been capped; The main bodies of 6 stations in Zhongshan section have been completed, and 8 tunnels have been connected. The Xiangshan Gongbei section, which is about to start construction, has a total length of about 46 kilometers and a designed speed of 160 kilometers per hour. It will be connected to Guangzhou Metro Line 18 for operation, realizing a public transportation mode and helping the core cities of the Greater Bay Area to reach each other in 60 minutes. Editor/Cheng Liting