[Jiangsu Kunshan Highway Engineering Test Inspection KSGL-SY2 Bidding Project] On July 3, 2022, the Jiangsu Provincial Public Resource Trading Network released the bidding announcement for the KSGL-SY2 tender section of the highway engineering test and inspection under construction in Kunshan City, the industry highway, the tenderers Kunshan Luda Changcheng Construction Development Co., Ltd. Group Co., Ltd., with a total investment of 8.2 billion yuan. Editor / Zhao E
Click to see more live >>
Latest
  • 2026.07.08 09:38
  • [Shenyang releases action plan for service industry, laying out low altitude industry]
  • The Shenyang Municipal Government in Liaoning Province has issued the "Shenyang Service Industry Capacity Expansion and Quality Improvement Action Plan", aiming to achieve a service industry added value of over 730 billion yuan by 2030. The Plan specifies the transformation and upgrading of existing tourism projects, enriching service formats such as red tourism and study tours. Develop low altitude tourism and promote the opening of low altitude sightseeing routes in scenic areas. Promote the application of facilities and equipment such as intelligent warehouse distribution and unmanned delivery in commercial logistics enterprises. Create low altitude+benchmark application scenarios, develop low altitude services such as agricultural and forestry crop protection, emergency rescue, etc. Promote the pilot construction of postal drone logistics. Support the expansion of low altitude service formats in the Faku Aviation Industry Base. By 2030, the total number of low altitude flight hours will reach 700000, and the total approved low altitude route kilometers will reach 734 kilometers.Editor/Gong Ziwei
  • 2026.07.08 09:28
  • [2.87 billion wind power project landed in Inner Mongolia]
  • On July 7, 2026, Huaneng Mengdong Chifeng Wengniute Banner's 1.2 million kilowatt wind, solar and energy storage integrated wind power PC general contracting project announced the bidding candidates, with a total bid amount of 2.87 billion yuan. The project is a key project in Shagehuang, equipped with a large-scale energy storage station, divided into two zones: north and south. It will be connected to the grid in batches by the end of 2026 and fully put into operation in 2027. In this bidding, the joint venture of China Electric Power Construction and China Energy Engineering occupies the first place in each section, with significant advantages. The completion of the project can stabilize wind power output, drive local industrial employment, and is the core project of the local wind and solar energy storage base.Editor/Gong Ziwei
Share

Retrieve password

Get verification code
Sure