[Gansu Jiayuguan Jiaxi 770MW photovoltaic project started] Recently, Jiayuguan Jiaxi 770 MW photovoltaic power generation project in Gansu Province started construction. The annual average power generation within 25 years of design operation period is 1552.682 million kWh, the annual utilization hours are 1693.07 hours, and the construction period is 8 months. Editor/He Yuting
Click to see more live >>
Latest
  • 2026.07.03 16:59
  • [Nanshankou Power Station Finishes Key Underground Construction]
  • On June 30, 2026, the excavation of the underground powerhouse of the Nanshankou Pumped Storage Power Station in Golmud, Qinghai, undertaken by Three Gorges Construction, was completed. The power station is the world's largest under construction pumped storage project at an altitude of over 3500 meters, with a total installed capacity of 2.4 million kilowatts. The project has entered the pouring and equipment installation stage, and the first batch of units is planned to be put into operation in 2028. Editor/Min Jing
  • 2026.07.03 16:57
  • [ENERGY CHINA Gezhouba Starts Zero-Carbon Highway in Guangxi]
  • On June 27, 2026, ENERGY CHINA Gezhouba Group began construction of the country's first integrated zero carbon highway project in Guangxi. Supporting photovoltaic energy storage and heavy-duty truck replenishment network, relying on ecological carbon sinks to achieve net zero carbon operation, in line with the national zero carbon channel construction deployment, and creating a demonstration model for low-carbon transformation of transportation. Editor/Min Jing
Share

Retrieve password

Get verification code
Sure