[Qinghai Jianzha, animal husbandry, solar and storage integration project started]On July 1, the Qinghai Jianzha 400,000-kilowatt pastoral-photovoltaic-storage integrated construction project invested and constructed by Power Construction New Energy Group started construction, equipped with 240 MWh of energy storage, and planned to use fixed photovoltaics. Editor/He Yuting
The Qinghai Provincial Development and Reform Commission has released the first batch of bidding for independent new energy storage projects on the grid side in 2026, with a total scale of 2GW and an energy storage duration of no less than 4 hours, to be implemented in 5 sections. The project is planned to be connected to the grid by the end of September 2027, and can enjoy an annual compensation of 185 yuan per kilowatt capacity to assist in the construction of new power systems in the province. Editor/Min Jing
The Vietnamese parliament has passed a resolution to increase the scale and configuration standards of the cross-border railway construction in Laojie, Hanoi, and Haiphong, and significantly increase investment. The railway is expected to be completed by 2030, optimizing cross-border trade logistics between China and Vietnam, connecting the China Europe transportation corridor, improving the layout of the Pan Asian Railway, and helping Vietnam enhance its position as a regional transportation hub. Editor/Min Jing