[The Keqiao China-Europe Freight train departed from China via Horgos Port]On November 28, the first Keqiao China-Europe freight train departed from the Khorgos railway port on its way to Tashkent, the capital of Uzbekistan. Since 2022, 19 China-Europe freight train lines have been added to the Khorgos railway port, bringing the total number to 75. Editor/Xu Shengpeng
On November 19, 2026, with the grid connection of some units of the wind farm in Mile Gorge, Yunnan, the installed capacity of new energy in Yunnan reached 83.599 million kilowatts (64.751 million kilowatts for photovoltaics and 18.848 million kilowatts for wind power), surpassing the installed capacity of hydropower by 83.41 million kilowatts for the first time and becoming the largest power source in the province. This marks the official transition of Yunnan's power structure from being dominated by hydropower to a new stage of water new synergy and multi energy complementarity.Editor/Gong Ziwei
At 20:50 on November 20, 2026, the second unit of the Huadian Kashgar 2 × 660000 kW cogeneration project successfully passed the 168 hour full load trial operation, marking the full capacity commissioning of Xinjiang's largest cogeneration project and China Huadian's first "coal-fired+new energy joint venture" project.Editor/Gong Ziwei