[The Keqiao China-Europe Freight train departed from China via Horgos Port]On November 28, the first Keqiao China-Europe freight train departed from the Khorgos railway port on its way to Tashkent, the capital of Uzbekistan. Since 2022, 19 China-Europe freight train lines have been added to the Khorgos railway port, bringing the total number to 75. Editor/Xu Shengpeng
Recently, the largest hydropower station in the upper reaches of the Jinsha River, Benzilan Hydropower Station, designed and constructed by China Electric Power Construction, started construction. The station spans across Sichuan and Yunnan provinces, with an installed capacity of 2.6 million kilowatts and four 650000 kilowatt mixed flow units. The dam is a roller compacted concrete gravity dam, with a maximum height of 183 meters and a total storage capacity of 1.32 billion cubic meters. As a key project of the 14th Five Year Plan and the 13th level of the "One Reservoir, Thirteen Levels" in the upper reaches of the Jinsha River, after completion, the annual power generation will be about 10.4 billion kilowatt hours, saving about 3.47 million tons of standard coal and reducing carbon emissions by about 8.63 million tons. Editor/Cheng Liting
Recently, the construction and modernization of the Yarkand River large-scale irrigation area, a national "dual" water conservancy project, has started in Zepu County, Kashgar, marking the comprehensive implementation stage of water security in southern Xinjiang irrigation areas. The project is a Class I large (1) type, designed to irrigate 5.58 million acres with an estimated budget of 8.3 billion yuan. It involves irrigation areas such as Yecheng, Zepu, Shache, Maigaiti, Bachu, Yuepu Lake, etc. It will build 1352.9 kilometers of channels to solve problems such as aging of the canal system and high water loss. After completion, it will help promote water-saving transformation, food safety, and rural revitalization. Editor/Cheng Liting