[Yunnan Pingbian pumed storage Power Station project was signed]On November 30, the People's Government of Pingbian County of Yunnan Province signed an investment and development agreement with PowerChina Kunming Survey, Design and Research Institute Co., LTD., for the Pingbian pumped storage power station project in Yunnan Province. The project is initially located near Dappingzi Natural Village, Meibunlong Village Committee, Heping Town, Pingbian County. The initial proposed installed capacity is 2.4 million kW, the static investment of the project is about 12.5 billion yuan, and the total construction period is about 72 months. Editor/Xu Shengpeng
Recently, the Quzhou section of the Hangzhou Chunkai Expressway officially obtained the construction permit for the entire line, entering a new stage of construction for the entire line. 11 large-scale on-site stations have been built, 46 construction sites are accelerating construction, and more than 1100 builders are fighting on the front line. The project is a component of the G25 Changshen Expressway of China National High Speed Railway, with a total length of 61 kilometers in Quzhou and a total investment of 13.65 billion yuan. It is planned to be completed in 2029. Editor/Cheng Liting
The Mengyan Reservoir in Kaiyang County, which has been in operation for 48 years, has been identified as a dangerous reservoir due to dam leakage, and recently officially launched a risk elimination and reinforcement project. The bureau is seeking provincial special funds of 2.36 million yuan to carry out overall maintenance of a reservoir with a total storage capacity of 205000 cubic meters. The project aims to completely eliminate safety hazards, restore flood control and water supply functions, ensure downstream life and property safety, and local agricultural irrigation water use. The Water Affairs Bureau will strengthen supervision to ensure timely and high-quality completion. Editor/Cheng Liting