[China Energy Construction signed 3 key projects] On March 1, 2023, a symposium on deepening cooperation between Liaoning Province and central enterprises was held in Beijing. The meeting thoroughly implemented the spirit of the 20th National Congress of the Communist Party of China and the deployment of the Central Economic Work Conference, earnestly studied and implemented a series of important instructions issued by General Secretary Xi Jinping on the revitalization of Northeast China and the revitalization and development of Liaoning, studied practical measures to further deepen the all-round cooperation between central enterprises and Liaoning, and jointly Contribute to promoting the overall improvement of economic operation and accelerating the establishment of a new development pattern. Sun Honghong, Deputy Secretary of the Party Committee and General Manager of Energy China, attended the meeting and witnessed the signing of the preliminary cooperation results project between Energy China and Liaoning Province. At the symposium, Energy China signed three key projects with the governments of Shenyang and Chaoyang respectively: Shenyang Green Renewable Smart Energy, Liaoning Provincial Integrated Circuit Equipment Demonstration Park North International Chip Valley Project, and Chaoyang Jianping Bentonite. The total planned investment is about 16.6 billion yuan. Editor / Zhao E
Click to see more live >>
Latest
  • 2024.04.25 16:49
  • [200MW/400MW energy storage project signed with Anhui Zongyang]
  • On the morning of April 23, the People's Government of Zongyang County in Anhui Province and Anhui Deyi Energy Technology Co., Ltd. held a signing ceremony for a new energy storage demonstration project in Zongyang County. It is understood that the project is one of 50 new energy storage projects in the province established by the Anhui Provincial Energy Bureau. The project is located in Hengbu Town, Zongyang County, with a total investment of 650 million yuan, using lithium iron phosphate lithium-ion batteries, the overall construction scale of energy storage power station is 200MW/400MWh. The project construction period is 2 years, and the grid connection will be completed in 2025. Editor/Xu Shengpeng
  • 2024.04.25 16:49
  • [Anhui Province "wind power to the countryside" red head document issued!]
  • Recently, the Anhui Provincial Development and Reform Commission, the Anhui Provincial Energy Bureau, and the Anhui Provincial Department of Agriculture and Rural Affairs jointly issued the "Notice on printing and distributing the overall plan for the Rural Revitalization Project of Wind Power in Anhui Province", which clearly stated that the collective economic organizations of villages with a collective economic operating income of less than 200,000 yuan in 2022 in the province (hereinafter referred to as "low-income villages"). According to the 500 kW standard of each village, the construction scale of rural revitalization wind power projects is configured, and the implementation is unified by the county as a unit. The province plans to implement the installed capacity of rural revitalization wind power projects of about 2 million kilowatts, and strive to be completed and put into operation by the end of 2026, and increase the annual income of each low-income village by 50,000 yuan or more after completion. Editor/Xu Shengpeng
Share

Retrieve password

Get verification code
Sure