[Dongfang Electric won the bid for the Minjiang Laomukong Hydropower Project] On March 1, 2023, Dongfang Electric won the bid for the supply project of 4 sets of 50 MW bulb tubular hydro-generator units for the Minjiang Laomukong Aviation Power Project, further consolidating Dongfang Electric’s market leadership in large-scale tubular hydro-generator sets Advantage. The Minjiang Laomukong Avionics Junction Project is located in Leshan City on the lower reaches of the Minjiang River. It is the first step of the four-step avionics project construction plan for the Leshan-Yibin section of the Minjiang River. A water resource comprehensive utilization project that takes into account both flood control and water supply. The project is invested and constructed by Sichuan Minjiang Port Aviation Power Development Co., Ltd., and construction will start in December 2021. The first unit is scheduled to be put into operation in 2026 for power generation. Editor / Zhao E
Click to see more live >>
Latest
  • 2024.04.25 16:49
  • [200MW/400MW energy storage project signed with Anhui Zongyang]
  • On the morning of April 23, the People's Government of Zongyang County in Anhui Province and Anhui Deyi Energy Technology Co., Ltd. held a signing ceremony for a new energy storage demonstration project in Zongyang County. It is understood that the project is one of 50 new energy storage projects in the province established by the Anhui Provincial Energy Bureau. The project is located in Hengbu Town, Zongyang County, with a total investment of 650 million yuan, using lithium iron phosphate lithium-ion batteries, the overall construction scale of energy storage power station is 200MW/400MWh. The project construction period is 2 years, and the grid connection will be completed in 2025. Editor/Xu Shengpeng
  • 2024.04.25 16:49
  • [Anhui Province "wind power to the countryside" red head document issued!]
  • Recently, the Anhui Provincial Development and Reform Commission, the Anhui Provincial Energy Bureau, and the Anhui Provincial Department of Agriculture and Rural Affairs jointly issued the "Notice on printing and distributing the overall plan for the Rural Revitalization Project of Wind Power in Anhui Province", which clearly stated that the collective economic organizations of villages with a collective economic operating income of less than 200,000 yuan in 2022 in the province (hereinafter referred to as "low-income villages"). According to the 500 kW standard of each village, the construction scale of rural revitalization wind power projects is configured, and the implementation is unified by the county as a unit. The province plans to implement the installed capacity of rural revitalization wind power projects of about 2 million kilowatts, and strive to be completed and put into operation by the end of 2026, and increase the annual income of each low-income village by 50,000 yuan or more after completion. Editor/Xu Shengpeng
Share

Retrieve password

Get verification code
Sure