[Construction of Kota Bharu Station of Malaysia East Rail Line project started] On the afternoon of May 12, 2023, the groundbreaking ceremony for the Kota Bharu Station of the Malaysia East Coast Railway Project was held in Kota Bharu, the capital of Kelantan. Kota Bharu Station is the first station to commence construction of the East Coast Rail Link project. The East Coast Railway starts from Kota Bharu, Kelantan, Malaysia, and ends at Port Klang, Selangor. The line is more than 600 kilometers long and is scheduled to be completed in 2027. The East Coast Railway project will connect important ports on the east and west coasts of the Malay Peninsula, and play a role in improving transportation, attracting investment, and creating jobs. The project is also regarded as a road bridge connecting the east and west coasts of Malaysia. After completion, it is expected to drive the economic development of the east coast of Malaysia and greatly improve the level of connectivity along the route. Edit/Ma Xue
Click to see more live >>
Latest
  • 2024.04.25 16:49
  • [200MW/400MW energy storage project signed with Anhui Zongyang]
  • On the morning of April 23, the People's Government of Zongyang County in Anhui Province and Anhui Deyi Energy Technology Co., Ltd. held a signing ceremony for a new energy storage demonstration project in Zongyang County. It is understood that the project is one of 50 new energy storage projects in the province established by the Anhui Provincial Energy Bureau. The project is located in Hengbu Town, Zongyang County, with a total investment of 650 million yuan, using lithium iron phosphate lithium-ion batteries, the overall construction scale of energy storage power station is 200MW/400MWh. The project construction period is 2 years, and the grid connection will be completed in 2025. Editor/Xu Shengpeng
  • 2024.04.25 16:49
  • [Anhui Province "wind power to the countryside" red head document issued!]
  • Recently, the Anhui Provincial Development and Reform Commission, the Anhui Provincial Energy Bureau, and the Anhui Provincial Department of Agriculture and Rural Affairs jointly issued the "Notice on printing and distributing the overall plan for the Rural Revitalization Project of Wind Power in Anhui Province", which clearly stated that the collective economic organizations of villages with a collective economic operating income of less than 200,000 yuan in 2022 in the province (hereinafter referred to as "low-income villages"). According to the 500 kW standard of each village, the construction scale of rural revitalization wind power projects is configured, and the implementation is unified by the county as a unit. The province plans to implement the installed capacity of rural revitalization wind power projects of about 2 million kilowatts, and strive to be completed and put into operation by the end of 2026, and increase the annual income of each low-income village by 50,000 yuan or more after completion. Editor/Xu Shengpeng
Share

Retrieve password

Get verification code
Sure