[China Gezhouba International Signs Contract for Indonesian Hydropower Project] On May 16, 2023, the joint venture formed by China Energy Construction International Group, China Gezhouba International Corporation, and Guangxi Institute signed the EPC contract for the Indonesian Sulawesi 315MW hydropower project with the Indonesian Mandeli Group. The project is located in the northern part of Sulawesi Island, Indonesia. It is planned to install 7 axial-flow generator sets, including 4 peak-shaving units and 3 run-of-the-mill units. The total installed capacity is about 315MW. The main buildings include concrete gravity dams, flood discharge buildings, Water diversion buildings and workshops, etc. After the project is completed, it will provide Sulawesi with stable and clean energy and alleviate the problem of power shortage. Edit/Ma Xue
Click to see more live >>
Latest
  • 2026.11.25 11:54
  • [The number of China Europe freight trains at Suifenhe Port has exceeded 5000]
  • On November 24th, China Railway Harbin Bureau announced that the cumulative traffic volume of China Europe freight trains at Suifenhe Port has exceeded 5000 trains. As an important port on the East Passage, since the first train departed in August 2018, the cargo structure has continued to optimize, with an increasing number of high value-added products exported and a richer variety of imported goods. At present, there are 27 channels open, connecting 14 countries and more than 60 cities in China. Suifenhe Station will continue to optimize the transportation organization, make good use of digital ports, and help open to the north and build the the Belt and Road.Editor/Li Xiaohua
  • 2026.11.25 11:49
  • [Vietnam plans to build its first ultra-high voltage direct current line]
  • On November 25, 2026, the Vietnamese Ministry of Industry and Trade proposed in the eighth draft of the electricity planning adjustment to prioritize the research and construction of the country's first ± 800 kV high-voltage direct current transmission line, connecting the central and southern coasts with the northern Red River Plain. The total planned length of the line is about 1050 kilometers, with a transmission capacity of 6000 to 8000 megawatts and an estimated investment of 3.47 billion US dollars.Currently, the transmission of electricity between North and South Vietnam relies on 500 kV AC lines, and the demand for new energy transmission from the central region continues to rise. This DC channel can undertake a large number of cross regional power transmission tasks in the long term. The construction period of this project is estimated to be 7 to 10 years. Currently, it is only in the planning and research stage and has not yet started bidding. There are also two newly added 500 kV AC channels included in the plan.Editor/Li Xiaohua
Share

Retrieve password

Get verification code
Sure