[Harbin Electric International signed the Bangladesh cycle power plant project] On June 5, 2023, Harbin Electric International and Bangladesh United Group signed the EP contract for the Bangladesh Anwara 590MW combined cycle power plant project in Dhaka, the capital of Bangladesh. The 590MW Anwara Combined cycle power plant project, with a Siemens H-class gas turbine, is located in Anwara district, Chittagong City, Bangladesh, on the south bank of the Kanapuri River. The owner, Bangladesh United Group, is a large local private enterprise, mainly engaged in power, real estate, medical, retail, textile and other businesses. Editor/Xue Ma
Click to see more live >>
Latest
  • 2026.06.24 10:30
  • [Breakthrough in solar powered seawater desalination]
  • On June 22, 2026, a team from the Chinese Academy of Sciences and Shenzhen University proposed a polymer locking mechanism to achieve efficient solar powered seawater desalination, with a daily water output of 20 liters, which can irrigate farmland and meet drinking water needs.Editor/Gao Xue
  • 2026.06.24 10:28
  • [Breaking the ice in the transaction of transmission rights between two power grids]
  • On June 18, 2026, State Grid and Southern Power Grid completed the first market-oriented transmission rights transaction in China at Yunxiao DC, with a transaction volume of 21.16 million kilowatt hours, breaking down inter provincial barriers and accelerating the construction of a unified electricity market.Editor/Gao Xue
Share

Retrieve password

Get verification code
Sure