[CRCC won the award for the project on the island of Saint Vincent in Cape Verde]On June 7, 2023, the Bureau of International Economic Cooperation of the Ministry of Commerce sent a notice of acceptance: informing CRCC 14 Bureau Group that it won the Chinese government's aid to the Mindelu Hospital Building project in St. Vincent Island, Cape Verde, which is the second project contracted by the company since it entered the Cape Verde market. The total construction area of the building project is about 5768 square meters, mainly the new obstetrics and gynecology building, pediatric building, while providing basic medical equipment and furniture, the main building is a semi-underground floor, four floors on the ground building, the total number of beds is 123 beds, in addition to a separate independent power distribution room, the project contract period of 18 months. Editor/Xue Ma
CRCC has won the bid for the open-pit mining and stripping project at the southern mining site of Mirado Copper Mine in Ecuador. The framework contract period is as long as ten years, including drilling and blasting, transportation and dumping, and maintenance of supporting facilities. The total scale of mining and stripping is huge, and the operation is planned to start in September 2026. Editor/Min Jing
LSHEC has developed six large towers for the low-carbon integration project in Xinjiang Chemical Industry. Leveraging the advantages of self-developed manufacturing integration, LSHEC has overcome the pressure of high temperature construction period and overcome multiple technical difficulties. Multiple equipment have been completed and put into place one after another, fully ensuring timely delivery. Editor/Min Jing