[The preliminary design of Chaoshan Bridge was approved] <p>Recently, the preliminary design of the Chaoshan Bridge project was approved by the Guangdong Provincial Department of Transportation. The Chaoshan Bridge project started in Outing, Longhu District, Shantou (connected to the northern extension of Taishan Road), crossed Meixi River to the north, and ended at Anbu Town, Chaoan District, Chaozhou City (connected to Zhanqian Road, Chaoan District). The technical standards of the first-class highway are adopted, the main line is 1.420km in length (the length of auxiliary roads on both sides is 0.97km), there is a bridge of 956.4m/1, auxiliary roads are equipped with 1 culvert and 3 plane crossings. The construction site of the project is about 240 meters downstream of the Meixi River Bridge on the Guangmeishan Railway. The total investment is about 740 million yuan and the construction period is 3 years. Editor/He Yuting<b label="见道logo" style="background-image: url(&quot;https://oss.seetao.com/upload/image/20240122/1022a171b1bf1b200ae8558fd16fd262.svg&quot;); display: inline-block; vertical-align: middle; background-repeat: no-repeat; transform: scale(0.7); margin-top: 0.05rem; width: 20px; height: 25px;"></b></p>
Click to see more live >>
Latest
  • 2025.10.24 17:44
  • [Environmental Impact Assessment Announcement for 8.5GW Photovoltaic Cell Project]
  • On October 21st, the Ecological Environment Bureau of Yibin City issued a decision on the approval of environmental impact assessment documents for construction projects made on October 17th, 2025. According to the relevant regulations of the environmental impact assessment approval process for construction projects, after review, our bureau has made an approval decision on the environmental impact assessment document for the high-efficiency TOPCon battery new technology upgrade project of Sichuan Dongci New Energy Technology Co., Ltd. The document shows that the total investment of the project is 210 million yuan, with an environmental protection investment of 1.56 million yuan. It is constructed in the central area of Gaojie Cluster in Yibin High tech Industrial Park, and the project is a renovation and expansion project.Editor/Bian Wenjun
  • 2025.10.24 17:41
  • [Haichen Energy Storage has won a new industrial and commercial storage order]
  • According to the official account of Haichen Energy Storage, recently, it reached a 1GWh strategic cooperation agreement with Energy 3000, a well-known European photovoltaic and energy storage solution provider. According to the agreement, Haichen Energy Storage will continue to supply high-performance energy storage systems for the next three years, including industrial and commercial energy storage integrated cabinets, DC cabinets, and container systems that are suitable for industrial and commercial energy storage scenarios; Energy 3000 relies on local market resources and channel advantages to work together to provide safe, efficient, and flexible energy storage solutions for European customers, jointly expanding new space in the European industrial and commercial energy storage market. According to experts, incomplete statistics on energy storage indicate that as of now, the energy storage orders announced by Haichen Energy Storage since 2025 have reached 37.275 GWh.Editor/Bian Wenjun
Share

Retrieve password

Get verification code
Sure