[Pterosaur UAV helps restore mobile phone signals in disaster areas]On July 21, the Ministry of Emergency Management urgently dispatched the Pterosaur UAV aerial emergency communication platform for a long-distance cross-regional flight. It took 4.5 hours to reach Gongyi City, Henan Province, and entered the communication interruption area of Mihe Town at 18:21, using Pterosaurs. The mobile public network base station carried by the UAV aerial emergency communication platform has realized a long-term and stable continuous mobile signal coverage of about 50 square kilometers. Editor/Xu Shengpeng
On September 8, 2026, the Cundinamarca Province of Colombia held an international promotion event for the northern tram project, with representatives from 17 countries including China, South Korea, the United States, and Portugal in attendance. The Chinese side expresses its willingness to participate. The project is 48.9 kilometers long with a total investment of over 5.5 billion US dollars, and the bidding work is progressing in an orderly manner. Editor/Min Jing
On September 9, 2026, the CCCC Malaysia East Coast Connection Railway Project launched dynamic testing operations simultaneously for the east and west sections, with the west section starting speed increase tests and the east section advancing signal system tests. The project takes Guandan as the dividing point, and the testing has moved from single section testing to full line multi system verification, achieving phased progress in engineering construction. Editor/Min Jing